STATE OF THE STADIUM

Jobs Completed: 
(1) Acquiring more land; raising and levelling the play area;
(2) Compound wall on three sides;
(3) Drainage gutter on all four sides;
(4) Toilet block with a tiered gallery over it.

Mandatory Additions Required:
(1) Two Players Rooms, one Officials’ Room. Advisable to have tiered gallery over them.
(2) Grass topping. Astro turf is ideal, but too costly. End-May we will close the grounds and seed for grass, hopefully Monsoon will help. End August it would be ready.

Desirable Additions:
(1) On the other side of the Pavilions, have a four tier gallery all along the length of the field.
(2) Flood lighting. The Arumanoor area is football crazy and late evening matches will attract larger crowds.

FINANCE
Accounts submitted to the CA for audit shows Rs.32,07,317 spent as of August 31, 2018. Donations received is only Rs.2,86,980. I had kept Rs.35L of my personal funds as a loan to the Stadium Project. Once it is over, it will this month, work can be progressed only if more infusion of funds is generated. It can be done IF NOT BY WAY OF DONATIONS, by selling advertising space in the Stadium or by finding people and or companies interested in owning their own Pavilions in the Stadium. The Stadium is ready to have prospects visiting to examine the facility. Meaning, any of you who has contacts may encourage the prospect to have a fact-finding tour. I will be glad to escort them.

HOSTEL:
The MVHS School leased another parcel adjoining the Stadium for a Hostel. I have already collected Rs.13,18,000 from my family members and has Rs.25,00,000 pledged. Adding to it my pledged Rs.25L, I will be able to finish two Dorms with all the paraphernalia with 26 beds. Construction will start on September 27, 2018 to make it ready for the next school year. It will be a gift from my family to KovalamFC.

Thank you for your support.
TJM 

ALL THE LATEST NEWS – ARCHITECTS DESIGNS  & PHOTOS { OCT, 2017 }

Keralas-Thiruvananthapuram-to-become-a-global-football-hub

The Stadium development fell a few weeks behind schedule due to a shortage of filling material. The government closed down all quarries following a fatal accident. We are now back on track and trying to catch up.

We have sufficient funds to get the ground to the required height and maybe to install sprinklers, then we will have to wait until the MP funds are released.
TJM

Kovalam Football Club

 

PRESS RELEASE
September 30, 2017

Kovalam FC to have a home ground

Dr. Shashi Tharoor, M. P., laid the foundation of Kovalam Football Club’s Stadium at MVH School, Arumanoor.

Sri O. Rajagopalan performed the ‘bhoomi pooja’.

Sri K. Anasalan presided over the public meeting, attended by more than 600. Block and local Panchayats Presidents and members also graced the occasion.

The VIP guests were received at the school gate by the school and Kovalam FC officials and escorted to the Stadium site by the school band. NCC boys and girls presented a Guard of Honour.

“Our stadium will bring Kerala Premier and I-Leagues to the District”, said the head coach of KFC, Ebin Rose.


KOVALAM FC STADIUM: The best news and a major step forward! We have started the work on the boundary walls of the Stadium. Anand-Niketan digitally surveyed the whole area, Dr. Mathew of the Agricultural College, a consultant to Chandrasekharan Nair and Greenfield Stadia) prepared the drainage system, ID Inc. finalized the design for the Pavilion and Gallery.

Foundation stone will be laid by Dr. Shashi Tharoor, MP and Mr. O. Rajagopal, MLA will perform the groundbreaking at a Public Meeting chaired by Mr. M. Ansalan, MLA tat MVH School, Poovar/Neyyattinkara Road, Arumanoor on 29th September 20017 at 5.30 p.m.